2 – Deflector cooling system for launch and long duration testing
Name of the system:
Deflector cooling system for launch and long-duration testing
Lead entity within the SAMMBA consortium:
MT Aerospace
Attachment point within the process chain of the Spaceport operator:
The system responsible for cooling the deflectors for launch and long-duration testing (?)
Major benefit [KPI] within the process chain: [cost reduction/processing time reduction/reliability
increase – preferably with quantitative figures]
Increase in reliability: The system can be used for testing and launch
Increase in availability: The system decreases the maintenance time due to the concept (singles tiles)
Anticipated R&D vector for the near/mid/long-term:
Near-term: operational in large scale
Mid-term: operational for bigger launchers
Modularity granted with the following standards:
The deflector cooling system for launch and long-duration testing doesn’t require special modifications and can be used at any spaceport.
Interoperability granted with the following standards:
IF to water source for active cooling
Systems interfaced:
Launch base, mechanical structures
< Go back to the diagram