4 – Requirements for Mobile Supply Unit (MSU)
Name of the system:
Requirements for Mobile Supply Unit (MSU)
Lead entity within the SAMMBA consortium:
MT Aerospace
Attachment point within the process chain of the Spaceport operator:
The system responsible for providing conditioning to the launcher such as power, AC, Air, etc everything that is needed for launcher and payload during transport
Major benefit [KPI] within the process chain: [cost reduction/processing time reduction/reliability
increase – preferably with quantitative figures]
Reduction in costs: only needed units (depending on launcher & payload)
Anticipated R&D vector for the near/mid/long-term:
Near-term: Get/obtain needed information (from launcher and payload)
Cost breakdown with COTS elements
Mid-term: operational
Modularity granted with the following standards:
Depends on information which is not available at the moment
Interoperability granted with the following standards:
To launcher, to payload, to transport mean, etc…
Systems interfaced:
Launcher, Launch base, AGV, mechanical structures
< Go back to the diagram