4 – Requirements for Mobile Supply Unit (MSU)

Name of the system:

Requirements for Mobile Supply Unit (MSU)

Lead entity within the SAMMBA consortium:

MT Aerospace

Attachment point within the process chain of the Spaceport operator:

The system responsible for providing conditioning to the launcher such as power, AC, Air, etc everything that is needed for launcher and payload during transport

Major benefit [KPI] within the process chain: [cost reduction/processing time reduction/reliability
increase – preferably with quantitative figures]

Reduction in costs: only needed units (depending on launcher & payload)

Anticipated R&D vector for the near/mid/long-term:

Near-term: Get/obtain needed information (from launcher and payload)
Cost breakdown with COTS elements

Mid-term: operational

Modularity granted with the following standards:

Depends on information which is not available at the moment

Interoperability granted with the following standards:

To launcher, to payload, to transport mean, etc…

Systems interfaced:

Launcher, Launch base, AGV, mechanical structures